Reference search

You can search our achievements in our database using the multi-criteria form below.

Your search found 22 hits

Atlas cement works04/26/2009

Atlas cement works

Work on assembly of mechanical components and structural steelwork & manufacture of technical components of a cement works for Ciments de l’Atlas Tonnage: 20 000 000 tonnes Site: BENI MELLAL Work ...

Piles03/02/2009

Piles

Operator: Chevron Site : Angola Tonnage : 190 tonnes Work implemented: steel cylinders over 10 meters high – design of 13 piles

Manufacture of wind energy towers for Tangier:02/26/2009

Manufacture of wind energy towers for Tangier:

Site : TANGIER Puissance : 140 MW Tower height: 65 m Number of towers: 165 Work implemented: Mak-out plan Manufacture of towers in compliance with the customer's A.F.C drawings Painting ...

PLEM02/26/2009

PLEM

Operator: Chevron Date of manufacture: 2009 Site: ANGOLA Tonnage: 500 tonnes Work implemented: frame + piping

Extension of the Kirene cement works in Senegal02/26/2009

Extension of the Kirene cement works in Senegal

Site: SENEGAL / Kirène Tonnage: 2 000 tonnes Work implemented : Manufacture and assembly of heavy-duty components: main filter, raw mix hopper, additive crusher and ducts Assembly of structural ...

Storage tanks02/26/2009

Storage tanks

Storage tanks for Mohammedia power plant Site : MOHAMMEDIA Tonnage : 2 180 tonnes Work implemented: Manufacture and installation of the following storage tanks: Demineralized ...

LAFARGE cement works Tetouan III12/26/2008

LAFARGE cement works Tetouan III

Site: Tetouan Tonnage: Work implemented: Crushing workshop and pre-homogenization workshop and linear stock Studies on buildings Supply and assembly of roof covering, building sheeting, ...

Construction and assembly of an oil platform12/17/2008

Construction and assembly of an oil platform

Tonnage : 4 000 tonnes Constructed at: Ain Sebaâ workshops (Casablanca) Assembled at: Yard at Jorf Lasfar port Hours worked (manufacture and assembly): 450 000 hours (3x8) Number of employees working ...

CIMAR cement works02/26/2008

CIMAR cement works

Project: Manufacture and assembly of a baking line with dry process in a cement works for Ciments du Maroc (CIMAR) Site : AIT BAHA/AGADIR Tonnage : Work implemented: Manufacture Supply of ...

Structural steelwork at Mohammed V Airport04/26/2007

Structural steelwork at Mohammed V Airport

Extension of the Mohammed V Airport – Terminal 2 Site : Casablanca Tonnage : Work implemented: structural steelwork

Liquid ammonia storage tanks02/26/2007

Liquid ammonia storage tanks

Construction and assembly of 2 liquid ammonia storage tanks, double envelope and transfer circuits Customer : MAROC PHOSPHORE (Groupe OCP) Capacity: 36 000 m3 each, liquid ammonia at -33°C Dimensions: ...

Risers Anchors01/26/2007

Risers Anchors

Operator: ESSO Exploration Site: ANGOLA Tonnage : 162 tonnes Work implemented: Manufacture of offshore equipment

Manufacture of wind energy towers for Essaouira02/26/2006

Manufacture of wind energy towers for Essaouira

Site: ESSAOUIRA-Cap Sim Date of manufacture: 2006 Power: 60 MW Tower height: 55 m Number of towers: 35 Work implemented: Mark-out plan Manufacture of towers in compliance with the customer's ...

Centre emplisseur 07/17/2005

Centre emplisseur

Site: laâyoune Work implemented: 1 sphère 4000 m3 2 cigares 200 m3

Coffered frame for boat access in LAAYOUNE Port 07/10/2004

Coffered frame for boat access in LAAYOUNE Port

Site: Laayoune Tonnage: 2000 T

Lafarge cement works Tetouan II02/26/2004

Lafarge cement works Tetouan II

Project: Supply and assembly for construction of the Lafarge cement works Tétouan II Site : TETOUAN Tonnage : Work implemented: Mechanical components Manufacture of flange and chute Cement ...

Pumping station on the Afourer site10/26/2003

Pumping station on the Afourer site

Project name: Construction of the energy transfer and pumping station on the Afourer site Site : AFOURER Tonnage : Work implemented: Manufacture, transport, assembly and painting Transport of ...

Manufacture of wind energy towers06/26/2003

Manufacture of wind energy towers

Customer: Compagnie Eolienne du Détroit (CED) Site: KOUDIA AL BAIDA, in the north of Morocco, to the south of the Straits of Gibraltar, between the towns of Tangier and Tetouan Power: 54 MW Length ...

Boilers07/27/2001

Boilers

Site: Sénégal

Fabrication of submerged storage vessel for gas diameter 6.307/17/2000

Fabrication of submerged storage vessel for gas diameter 6.3

Site: Mohammedia Tonnage: 660 T Hours worked: 25 243 hours Work implemented: Etude Génie civil Montage Peinture de réservoir immergé Equipements associés.    

Fabrication and Erection of Sulphuric Acid Unit11/30/1997

Fabrication and Erection of Sulphuric Acid Unit

Site: JORF LASFAAR Tonnage: Work implemented: Exchanger gas/gas. Converter Absorption, heat and intermediate tower. Ducts.    

Smart shose02/14/1996

Smart shose

Site: CONGO Tonnage: 660 T